Thursday, January 10, 2013

Chain Link Fence Installation

  • All posts (including line post) are set in concrete approximately 24” deep and a hole that is 6” in diameter.
  • Posts are spaced along the fence line not more than 10’ apart.
  • The wire is stretched to proper tension for maximum strength.
  • Setting of all posts is the first part of fence construction. The post will set in the concrete for several days before the rest of the fence is assembled, the fabric stretched, and the job completed.
Located in the Minneapolis and St. Paul area, Sterling Fence, Inc. offers a free chain link fencing quote.

Get Started Today!

Get a Free Quote

Call: 952.888.6843


Download Our Product List

No comments:

Post a Comment